Brooklyn Bridge Park
The Brooklyn Bridge Park project encompasses the complete redevelopment of the waterfront area, including landscaping, pedestrian pathways, recreational facilities, and infrastructure upgrades. The allocated site area spans 85,000 sq ft along the East River. The development consortium engaged RegrexSolutions for comprehensive estimation and takeoff services to ensure accurate project budgeting.
Services Provided
Cost Estimation Services: Detailed financial analysis for the entire park development
Material Takeoff Services: Precise quantification of all construction materials
Preliminary Estimate: Early-stage cost evaluation to guide funding decisions
Trade-Specific Estimating Services
Our team delivered specialized estimates for:
Structural: Concrete, Metals, Excavation
Architectural: Drywall, Openings & Finishes, Painting
MEP: Mechanical, Electrical, Plumbing
Specialty Systems: Sheet Metal, Ductwork, Fireproofing, Fire Stopping
Project Impact
Enabled value engineering that optimized waterfront construction costs by 18%
Delivered 98% accurate material forecasts using BIM-integrated takeoffs
Completed full-cost analysis within 72-hour turnaround for bid submission