West Rocks Road Sidewalk Project State Project

The Brooklyn Bridge Park project involves the complete transformation of the East River waterfront, featuring landscaped green spaces, pedestrian promenades, recreational facilities, and critical infrastructure upgrades. Spanning 85,000 square feet, this urban renewal initiative required meticulous planning and budgeting. The development consortium partnered with RegrexSolutions for end-to-end estimation and takeoff services to ensure financial precision and project viability.

Services Provided

  • Cost Estimation Services: Comprehensive financial analysis for all park development phases

  • Material Takeoff Services: Accurate quantification of construction materials

  • Preliminary Estimate: Initial cost assessment to secure funding and guide planning

Trade-Specific Estimating Services

Our team delivered detailed estimates for:

  • Structural: Concrete, Metals, Excavation

  • Architectural: Drywall, Openings & Finishes, Painting

  • MEP: Mechanical, Electrical, Plumbing

  • Specialty Systems: Sheet Metal, Ductwork, Fireproofing, Fire Stopping

Project Impact

  • Cost Efficiency: Achieved 18% savings through value engineering for waterfront construction

  • Accuracy: Delivered 98% precise material forecasts using BIM-integrated takeoffs

  • Timeliness: Completed full-cost analysis within 72 hours to meet bid deadlines

RegrexSolutions provided complete estimating services for this Connecticut DOT-approved sidewalk enhancement project along West Rocks Road, spanning 2.3 miles of urban thoroughfare. The state-funded initiative involved demolition of existing walkways and construction of new ADA-compliant sidewalks (5′ width), including 28 curb ramps, 12 pedestrian crossing signals, and integrated stormwater drainage systems across a 45,000 sq ft work area. Our team delivered precise concrete takeoffs (1,850 CY), sitework estimates for excavation/grading, and MEP coordination for underground utility relocations. The project required special materials estimating for slip-resistant concrete finishes and historically appropriate street furnishings to match Norwalk’s architectural character. Through BIM-powered quantity surveys, we identified 15% cost savings by optimizing pour schedules and pre-cast element usage, while ensuring full compliance with ConnDOT Standard Specifications for Road and Bridge Construction. Our 72-hour turnaround on revised bid documents helped the contractor meet strict state procurement deadlines for this $3.2M safety improvement project serving 8,000+ daily pedestrians.