Brooklyn Bridge Park

The Brooklyn Bridge Park project encompasses the complete redevelopment of the waterfront area, including landscaping, pedestrian pathways, recreational facilities, and infrastructure upgrades. The allocated site area spans 85,000 sq ft along the East River. The development consortium engaged RegrexSolutions for comprehensive estimation and takeoff services to ensure accurate project budgeting.

Services Provided

  • Cost Estimation Services: Detailed financial analysis for the entire park development

  • Material Takeoff Services: Precise quantification of all construction materials

  • Preliminary Estimate: Early-stage cost evaluation to guide funding decisions

Trade-Specific Estimating Services

Our team delivered specialized estimates for:

  • Structural: Concrete, Metals, Excavation

  • Architectural: Drywall, Openings & Finishes, Painting

  • MEP: Mechanical, Electrical, Plumbing

  • Specialty Systems: Sheet Metal, Ductwork, Fireproofing, Fire Stopping

Project Impact

  • Enabled value engineering that optimized waterfront construction costs by 18%

  • Delivered 98% accurate material forecasts using BIM-integrated takeoffs

  • Completed full-cost analysis within 72-hour turnaround for bid submission

RegrexSolutions provided comprehensive estimating services for the Brooklyn Bridge Park redevelopment project located along New York’s East River waterfront. Our team delivered complete cost estimation and material takeoff services for this 85,000 sq ft urban renewal project, which included landscape architecture, pedestrian infrastructure, recreational facilities, and structural upgrades. We developed preliminary estimates and detailed cost analyses for all construction phases, enabling the development team to establish accurate budgets before breaking ground. Our trade-specific estimating services covered concrete work, structural metals, excavation, mechanical systems, electrical installations, plumbing, drywall, painting, sheet metal fabrication, ductwork, fireproofing, fire stopping systems, and architectural finishes. Using advanced BIM technology, we generated 98% accurate material forecasts that accounted for the project’s unique marine environment challenges, ultimately helping the contractors optimize costs by 18% while maintaining the park’s design integrity and public safety standards throughout this transformative Brooklyn waterfront development.